The best ERSS designs are not only safe on paper. They can be built on your site, within your programme. That is where early contractor input helps.
What “design support” means
In Singapore, the ERSS design and submission are the responsibility of the appointed QP. Our role as an ERSS contractor is to support that process with practical, site-based input. We do not replace the QP’s design.
Where we can help
- Concept options. Comparing sheet pile, soldier pile, and steel plate systems against your depth, ground, and boundary conditions
- Method selection. Vibro or silent piling, and excavator or crane-mounted equipment, based on noise, vibration and access limits
- Buildability checks. Pile lengths, working space, strut layouts, clashes with services, and sequence of excavation
- Temporary works details. Strut and waler connections, decking and access, and fabrication details
- Programme and cost input. Realistic installation rates and the impact of different methods
Why involve a contractor early?
A design that ignores access, obstruction risk, or equipment limits often needs redesign later, which costs time and money. A short buildability review early on is far cheaper than a revised submission later.
What to prepare
Site plan, boundary and adjacent structures, utility records, borehole data, proposed excavation levels and your programme.